Helpful drawings, documents, and links.
Get free Autocad and PDF drawings. Be sure to also read the Design Guide as you start drawings your plans. Links to third-party artists and products are also here.
Get free Autocad and PDF drawings. Be sure to also read the Design Guide as you start drawings your plans. Links to third-party artists and products are also here.
Fill wall cavities with mineral wool soundproofing insulation:
Noise-reducing laminated drywall:
Visco-elastic damping sealants. Sandwich it between rigid sheet materials, and/or use it to fill gaps and joints around the perimeter of walls, ceilings, and openings. Examples:
Use acoustical putty pads to encapsulate electrical boxes, especially ones that are on opposite sides of the same stud cavity. Examples:
Add a layer of mass-loaded vinyl (MLV) between rigid materials. Examples:
The answer to this question gets its own cute little flow chart on its own web page. See our Process page.
It can take 4 months or more to get the equipment ordered, prepped, and ready to ship.
A pair of lanes take about one week to install. Single lanes take about six days, and 4-lane projects take about 11 days.
The window of opportunity is after HVAC is up and running but before flooring is installed.